CUP FIELD TOOLS · IEC 62443 system assurance

A system change is planned. What remains unproven?

Review one industrial system or change, with a defined operational boundary. Identify which requirements and responsibilities apply, then connect the installed configuration to evidence and open actions.

12 chapters · 36 detailed verifications · Initial and detailed review modes · No account required

Start the evidence review →
WHY USE IT?Make the installed-system claim reviewable.

A product certificate or segmentation drawing leaves integration questions unanswered. Organise the risk rationale, implementation evidence and operational handover so the asset owner can see what still needs to be demonstrated.

YOUR REVIEW PATH

Scope → Evidence → Action

A focused review with an accountable outcome.

System boundaryDefine the reviewed scope
Review ↗
Implementation evidenceChallenge the supporting records
Review ↗
Operational acceptanceAssign the unresolved actions
Review ↗
Your exportable action plan

Missing records · Owners · Next steps

Illustrative review flow. Select a checkpoint to explore it.

How to use this review

Bring the right people: asset-owner, integrator, product-supplier, operations and safety roles. Record roles and non-sensitive references.

  1. Define one decision. Record the baseline, applicable basis and accountable owner. Identify uncertain applicability before treating requirements as settled.
  2. Challenge the evidence. Work through twelve questions. Reference existing records, explain what they demonstrate and leave unsupported conclusions open.
  3. Take an action plan to the review. Export a report or CSV, assign owners and dates, and save a review file to update later.

The first pass identifies missing work. It does not complete the underlying assessment, tests or regulatory review. Use “Not applicable” only with a recorded rationale.

Before design or procurement

Agree the scope, responsibilities and evidence to request before accepting a supplier or solution claim.

Before release or deployment

Check the current baseline and unresolved conditions with the authorised decision owner.

After a material change

Reopen the review when the use, configuration, evidence, legal basis or supporting assumptions change.

Build your action plan →

Twelve evidence checkpoints

Read or print this table without JavaScript. Guided saving and exports require JavaScript. Keep sensitive evidence in approved systems; use non-sensitive references here.

IEC 62443 system assurance · original CUP review prompts
CheckpointEvidence to assembleDecision to resolveReview notes
01 · System under considerationSystem boundary, intended operation, assets, interfaces and lifecycle stage.
Detailed verifications (3)

Suggested review roles: Asset owner; system architect. Lifecycle: System and change definition. Assess each verification for this chapter’s actual scope and the role responsible for it. Record the applicable requirement/decision reference; any N/A needs a specific reason. These are CUP engineering prompts, not a complete normative inventory.

  1. System boundary approved

    Evidence to request: System definition reference. Document only when: Assets and external dependencies are bounded.

  2. Operating state described

    Evidence to request: Operational context record. Document only when: Essential functions and intended operation are explicit.

  3. Change scoped

    Evidence to request: Change-impact record. Document only when: The reviewed modification is distinguished from the entire facility.

Which system and change are being assessed?
02 · Roles, parts and editionsAsset-owner, service-provider and product-supplier roles; applicable parts, editions and contractual scope.
Detailed verifications (3)

Suggested review roles: Asset owner; integrator; product supplier. Lifecycle: Role and contractual scope. Assess each verification for this chapter’s actual scope and the role responsible for it. Record the applicable requirement/decision reference; any N/A needs a specific reason. These are CUP engineering prompts, not a complete normative inventory.

  1. Roles separated

    Evidence to request: Responsibility register. Document only when: Asset-owner, service-provider and product-supplier roles are identified.

  2. Parts and editions selected

    Evidence to request: Applicability register. Document only when: Selected parts and editions have a role-specific rationale.

  3. Deliverables bounded

    Evidence to request: Contractual assurance scope. Document only when: Product and installed-system claims are distinguished.

Which requirements apply to which party and deliverable?
03 · Risk and operational consequencesRisk assessment, process and safety dependencies, credible threat paths and treatment owners.
Detailed verifications (3)

Suggested review roles: Risk assessor; operations/safety owner. Lifecycle: Consequence and threat assessment. Assess each verification for this chapter’s actual scope and the role responsible for it. Record the applicable requirement/decision reference; any N/A needs a specific reason. These are CUP engineering prompts, not a complete normative inventory.

  1. Operational harm examined

    Evidence to request: Consequence assessment. Document only when: Relevant process and safety effects inform the review.

  2. Threat paths considered

    Evidence to request: Threat scenario record. Document only when: Credible routes to the consequences are examined.

  3. Treatment authority identified

    Evidence to request: Risk decision reference. Document only when: Residual uncertainty has an accountable owner.

What operational harm drives the security requirements?
04 · Zones and conduitsSegmentation rationale, grouped assets, inter-zone flows and documented assumptions.
Detailed verifications (3)

Suggested review roles: Network/system architect; operations. Lifecycle: Zone/conduit design and review. Assess each verification for this chapter’s actual scope and the role responsible for it. Record the applicable requirement/decision reference; any N/A needs a specific reason. These are CUP engineering prompts, not a complete normative inventory.

  1. Asset grouping justified

    Evidence to request: Zone rationale. Document only when: Grouping follows assessed risks and operational constraints.

  2. Conduits described

    Evidence to request: Flow review reference. Document only when: Relevant communications cross identified boundaries.

  3. Shared dependencies reviewed

    Evidence to request: Dependency assessment. Document only when: Common services do not silently bypass the model.

Do zones and conduits reflect the actual system and its risks?
05 · Target security requirementsRisk-derived target requirements, applicable foundational requirements and accepted exceptions.
Detailed verifications (3)

Suggested review roles: Security architect; asset risk owner. Lifecycle: Target requirement selection. Assess each verification for this chapter’s actual scope and the role responsible for it. Record the applicable requirement/decision reference; any N/A needs a specific reason. These are CUP engineering prompts, not a complete normative inventory.

  1. Target requirements justified

    Evidence to request: Risk-to-requirement profile. Document only when: The target follows the assessed risks.

  2. Foundational requirements considered

    Evidence to request: Requirement selection record. Document only when: The relevant protection needs and exclusions are explicit.

  3. Target and evidence distinguished

    Evidence to request: Assurance claim review. Document only when: A target is not described as an achieved system result.

What protection is required for each assessed zone and conduit?
06 · Implemented boundary controlsDeployed configurations, permitted flows, authentication and authorisation design.
Detailed verifications (3)

Suggested review roles: Integrator; control/network owners. Lifecycle: Installed-control verification. Assess each verification for this chapter’s actual scope and the role responsible for it. Record the applicable requirement/decision reference; any N/A needs a specific reason. These are CUP engineering prompts, not a complete normative inventory.

  1. Deployed rules matched

    Evidence to request: Configuration verification. Document only when: Installed controls match the approved design.

  2. Authority bounded

    Evidence to request: Access enforcement review. Document only when: Permissions match the intended operational tasks.

  3. Boundary behaviour tested

    Evidence to request: Approved verification record. Document only when: Results cover alternate routes and rejected actions.

What enforces the required boundaries in the installed baseline?
07 · Component and development evidenceSupplier capabilities, product development evidence, supported versions and integration constraints.
Detailed verifications (3)

Suggested review roles: Product supplier; integrator. Lifecycle: Product capability and integration review. Assess each verification for this chapter’s actual scope and the role responsible for it. Record the applicable requirement/decision reference; any N/A needs a specific reason. These are CUP engineering prompts, not a complete normative inventory.

  1. Capability evidence applicable

    Evidence to request: Product capability review. Document only when: Evidence covers the actual component version.

  2. Development evidence scoped

    Evidence to request: Supplier development record. Document only when: Its scope and limitations are understood.

  3. Integration gap assessed

    Evidence to request: Integrator gap review. Document only when: A component certificate does not stand in for system acceptance.

Do selected components support the system requirements under actual use?
08 · Integration and acceptanceAllocated responsibilities, installation records, acceptance tests and residual deviations.
Detailed verifications (3)

Suggested review roles: Integrator; site acceptance authority. Lifecycle: Installation and system acceptance. Assess each verification for this chapter’s actual scope and the role responsible for it. Record the applicable requirement/decision reference; any N/A needs a specific reason. These are CUP engineering prompts, not a complete normative inventory.

  1. Installation baseline recorded

    Evidence to request: As-built record. Document only when: Acceptance refers to the installed configuration.

  2. Site tests representative

    Evidence to request: Site acceptance results. Document only when: Relevant dependencies and conditions are exercised safely.

  3. Deviations owned

    Evidence to request: Acceptance deviation record. Document only when: Open issues have an explicit treatment and accepting role.

Who verifies the integrated system and accepts unresolved gaps?
09 · Operational access and service providersUser and service identities, maintenance windows, remote routes and revocation evidence.
Detailed verifications (3)

Suggested review roles: Access administrator; service provider. Lifecycle: Maintenance access and offboarding. Assess each verification for this chapter’s actual scope and the role responsible for it. Record the applicable requirement/decision reference; any N/A needs a specific reason. These are CUP engineering prompts, not a complete normative inventory.

  1. Privileges justified

    Evidence to request: Access review reference. Document only when: Users and service identities match necessary tasks.

  2. Remote routes mediated

    Evidence to request: Remote-access assessment. Document only when: Supplier connections remain within the intended boundaries.

  3. Revocation demonstrated

    Evidence to request: Access termination record. Document only when: Expired work and departing personnel lose usable access.

Can each maintenance privilege be justified and withdrawn?
10 · Monitoring and vulnerability responseLog coverage, alert ownership, vulnerability intake, triage and incident procedures.
Detailed verifications (3)

Suggested review roles: Monitoring/response owner; asset owner. Lifecycle: Operation and vulnerability response. Assess each verification for this chapter’s actual scope and the role responsible for it. Record the applicable requirement/decision reference; any N/A needs a specific reason. These are CUP engineering prompts, not a complete normative inventory.

  1. Events observable

    Evidence to request: Logging coverage review. Document only when: Relevant activity can be reconstructed.

  2. Response owned

    Evidence to request: Alert escalation procedure. Document only when: An accountable responder can act on alerts.

  3. Vulnerabilities triaged

    Evidence to request: Vulnerability response sample. Document only when: Findings reach an owned operational decision.

Can the operator detect, interpret and act on relevant security events?
11 · Change, recovery and continuityPatch decisions, change authorisation, backup scope, restore results and degraded-operation limits.
Detailed verifications (3)

Suggested review roles: Change/recovery owner; operations/safety. Lifecycle: Change, continuity and restoration. Assess each verification for this chapter’s actual scope and the role responsible for it. Record the applicable requirement/decision reference; any N/A needs a specific reason. These are CUP engineering prompts, not a complete normative inventory.

  1. Change risk reviewed

    Evidence to request: Change authorisation record. Document only when: Patching and configuration changes consider operational constraints.

  2. Restoration exercised

    Evidence to request: Restore exercise reference. Document only when: Backups have a demonstrated recovery path.

  3. Degraded operation bounded

    Evidence to request: Continuity assessment. Document only when: Dependency failure and emergency access have reviewed limits.

Can the system be changed and recovered within its operational constraints?
12 · Assurance boundaries and reassessmentClaims, requirement coverage, limitations, corrective actions and review triggers.
Detailed verifications (3)

Suggested review roles: Asset assurance owner; integrator. Lifecycle: Assurance review and lifecycle change. Assess each verification for this chapter’s actual scope and the role responsible for it. Record the applicable requirement/decision reference; any N/A needs a specific reason. These are CUP engineering prompts, not a complete normative inventory.

  1. Claims bounded

    Evidence to request: Assurance argument index. Document only when: Each claim states scope and limitations.

  2. Corrective actions tracked

    Evidence to request: Action register. Document only when: Unproven items retain owners and closure criteria.

  3. Reassessment triggered

    Evidence to request: Lifecycle review record. Document only when: Topology, support or process changes can reopen the argument.

What remains unproven and who owns the next review?
PRIMARY REFERENCES · REVIEWED 1 NOVEMBER 2026

Check the source and its applicability.

Public catalogue and guidance links support orientation. Licensed standards and legally authentic texts govern their respective requirements. This worksheet does not establish equivalence between standards and regulations.

IEC — standards family and roles

Use the official source to check the relevant scope, current text and applicable conditions.

Open official reference →

IEC 62443-3-2:2020 — public catalogue

Use the official source to check the relevant scope, current text and applicable conditions.

Open official reference →

Joint agency guidance — secure OT connectivity

Use the official source to check the relevant scope, current text and applicable conditions.

Open official reference →