Before design or procurement
Agree the scope, responsibilities and evidence to request before accepting a supplier or solution claim.
Cybersecurity Under PressureReal Attacks. Real Lessons.
Subscribe
Review one industrial system or change, with a defined operational boundary. Identify which requirements and responsibilities apply, then connect the installed configuration to evidence and open actions.
12 chapters · 36 detailed verifications · Initial and detailed review modes · No account required
A product certificate or segmentation drawing leaves integration questions unanswered. Organise the risk rationale, implementation evidence and operational handover so the asset owner can see what still needs to be demonstrated.
A focused review with an accountable outcome.
Missing records · Owners · Next steps
Illustrative review flow. Select a checkpoint to explore it.
Bring the right people: asset-owner, integrator, product-supplier, operations and safety roles. Record roles and non-sensitive references.
The first pass identifies missing work. It does not complete the underlying assessment, tests or regulatory review. Use “Not applicable” only with a recorded rationale.
Agree the scope, responsibilities and evidence to request before accepting a supplier or solution claim.
Check the current baseline and unresolved conditions with the authorised decision owner.
Reopen the review when the use, configuration, evidence, legal basis or supporting assumptions change.
Read or print this table without JavaScript. Guided saving and exports require JavaScript. Keep sensitive evidence in approved systems; use non-sensitive references here.
| Checkpoint | Evidence to assemble | Decision to resolve | Review notes |
|---|---|---|---|
| 01 · System under consideration | System boundary, intended operation, assets, interfaces and lifecycle stage.Detailed verifications (3)Suggested review roles: Asset owner; system architect. Lifecycle: System and change definition. Assess each verification for this chapter’s actual scope and the role responsible for it. Record the applicable requirement/decision reference; any N/A needs a specific reason. These are CUP engineering prompts, not a complete normative inventory.
| Which system and change are being assessed? | |
| 02 · Roles, parts and editions | Asset-owner, service-provider and product-supplier roles; applicable parts, editions and contractual scope.Detailed verifications (3)Suggested review roles: Asset owner; integrator; product supplier. Lifecycle: Role and contractual scope. Assess each verification for this chapter’s actual scope and the role responsible for it. Record the applicable requirement/decision reference; any N/A needs a specific reason. These are CUP engineering prompts, not a complete normative inventory.
| Which requirements apply to which party and deliverable? | |
| 03 · Risk and operational consequences | Risk assessment, process and safety dependencies, credible threat paths and treatment owners.Detailed verifications (3)Suggested review roles: Risk assessor; operations/safety owner. Lifecycle: Consequence and threat assessment. Assess each verification for this chapter’s actual scope and the role responsible for it. Record the applicable requirement/decision reference; any N/A needs a specific reason. These are CUP engineering prompts, not a complete normative inventory.
| What operational harm drives the security requirements? | |
| 04 · Zones and conduits | Segmentation rationale, grouped assets, inter-zone flows and documented assumptions.Detailed verifications (3)Suggested review roles: Network/system architect; operations. Lifecycle: Zone/conduit design and review. Assess each verification for this chapter’s actual scope and the role responsible for it. Record the applicable requirement/decision reference; any N/A needs a specific reason. These are CUP engineering prompts, not a complete normative inventory.
| Do zones and conduits reflect the actual system and its risks? | |
| 05 · Target security requirements | Risk-derived target requirements, applicable foundational requirements and accepted exceptions.Detailed verifications (3)Suggested review roles: Security architect; asset risk owner. Lifecycle: Target requirement selection. Assess each verification for this chapter’s actual scope and the role responsible for it. Record the applicable requirement/decision reference; any N/A needs a specific reason. These are CUP engineering prompts, not a complete normative inventory.
| What protection is required for each assessed zone and conduit? | |
| 06 · Implemented boundary controls | Deployed configurations, permitted flows, authentication and authorisation design.Detailed verifications (3)Suggested review roles: Integrator; control/network owners. Lifecycle: Installed-control verification. Assess each verification for this chapter’s actual scope and the role responsible for it. Record the applicable requirement/decision reference; any N/A needs a specific reason. These are CUP engineering prompts, not a complete normative inventory.
| What enforces the required boundaries in the installed baseline? | |
| 07 · Component and development evidence | Supplier capabilities, product development evidence, supported versions and integration constraints.Detailed verifications (3)Suggested review roles: Product supplier; integrator. Lifecycle: Product capability and integration review. Assess each verification for this chapter’s actual scope and the role responsible for it. Record the applicable requirement/decision reference; any N/A needs a specific reason. These are CUP engineering prompts, not a complete normative inventory.
| Do selected components support the system requirements under actual use? | |
| 08 · Integration and acceptance | Allocated responsibilities, installation records, acceptance tests and residual deviations.Detailed verifications (3)Suggested review roles: Integrator; site acceptance authority. Lifecycle: Installation and system acceptance. Assess each verification for this chapter’s actual scope and the role responsible for it. Record the applicable requirement/decision reference; any N/A needs a specific reason. These are CUP engineering prompts, not a complete normative inventory.
| Who verifies the integrated system and accepts unresolved gaps? | |
| 09 · Operational access and service providers | User and service identities, maintenance windows, remote routes and revocation evidence.Detailed verifications (3)Suggested review roles: Access administrator; service provider. Lifecycle: Maintenance access and offboarding. Assess each verification for this chapter’s actual scope and the role responsible for it. Record the applicable requirement/decision reference; any N/A needs a specific reason. These are CUP engineering prompts, not a complete normative inventory.
| Can each maintenance privilege be justified and withdrawn? | |
| 10 · Monitoring and vulnerability response | Log coverage, alert ownership, vulnerability intake, triage and incident procedures.Detailed verifications (3)Suggested review roles: Monitoring/response owner; asset owner. Lifecycle: Operation and vulnerability response. Assess each verification for this chapter’s actual scope and the role responsible for it. Record the applicable requirement/decision reference; any N/A needs a specific reason. These are CUP engineering prompts, not a complete normative inventory.
| Can the operator detect, interpret and act on relevant security events? | |
| 11 · Change, recovery and continuity | Patch decisions, change authorisation, backup scope, restore results and degraded-operation limits.Detailed verifications (3)Suggested review roles: Change/recovery owner; operations/safety. Lifecycle: Change, continuity and restoration. Assess each verification for this chapter’s actual scope and the role responsible for it. Record the applicable requirement/decision reference; any N/A needs a specific reason. These are CUP engineering prompts, not a complete normative inventory.
| Can the system be changed and recovered within its operational constraints? | |
| 12 · Assurance boundaries and reassessment | Claims, requirement coverage, limitations, corrective actions and review triggers.Detailed verifications (3)Suggested review roles: Asset assurance owner; integrator. Lifecycle: Assurance review and lifecycle change. Assess each verification for this chapter’s actual scope and the role responsible for it. Record the applicable requirement/decision reference; any N/A needs a specific reason. These are CUP engineering prompts, not a complete normative inventory.
| What remains unproven and who owns the next review? |
Public catalogue and guidance links support orientation. Licensed standards and legally authentic texts govern their respective requirements. This worksheet does not establish equivalence between standards and regulations.
Use the official source to check the relevant scope, current text and applicable conditions.
Open official reference →Use the official source to check the relevant scope, current text and applicable conditions.
Open official reference →Use the official source to check the relevant scope, current text and applicable conditions.
Open official reference →