CUP FIELD TOOLS · CRA product readiness

Can your product team show the evidence behind its CRA plan?

Review one product and market activity under the Cyber Resilience Act. Establish scope and responsibilities, then identify gaps in product security, vulnerability handling, reporting readiness and the supporting dossier.

12 chapters · 37 detailed verifications · Initial and detailed review modes · No account required

Start the evidence review →
WHY USE IT?Turn a regulatory workstream into owned evidence requests.

Use a concrete product baseline to separate applicability questions from engineering and response work. Bring the product, security and regulatory teams a shared list of records to obtain, decisions to resolve and actions to track.

YOUR REVIEW PATH

Scope → Evidence → Action

A focused review with an accountable outcome.

Product & roleDefine the reviewed scope
Review ↗
Product & response evidenceChallenge the supporting records
Review ↗
Readiness decisionAssign the unresolved actions
Review ↗
Your exportable action plan

Missing records · Owners · Next steps

Illustrative review flow. Select a checkpoint to explore it.

How to use this review

Bring the right people: product, security engineering, vulnerability-response and regulatory roles. Record roles and non-sensitive references.

  1. Define one decision. Record the baseline, applicable basis and accountable owner. Identify uncertain applicability before treating requirements as settled.
  2. Challenge the evidence. Work through twelve questions. Reference existing records, explain what they demonstrate and leave unsupported conclusions open.
  3. Take an action plan to the review. Export a report or CSV, assign owners and dates, and save a review file to update later.

The first pass identifies missing work. It does not complete the underlying assessment, tests or regulatory review. Use “Not applicable” only with a recorded rationale.

Before design or procurement

Agree the scope, responsibilities and evidence to request before accepting a supplier or solution claim.

Before release or deployment

Check the current baseline and unresolved conditions with the authorised decision owner.

After a material change

Reopen the review when the use, configuration, evidence, legal basis or supporting assumptions change.

Build your action plan →

Twelve evidence checkpoints

Read or print this table without JavaScript. Guided saving and exports require JavaScript. Keep sensitive evidence in approved systems; use non-sensitive references here.

CRA product readiness · original CUP review prompts
CheckpointEvidence to assembleDecision to resolveReview notes
01 · Product and market scopeProduct functions, connectivity, remote processing dependencies, market placement and exclusion analysis.
Detailed verifications (3)

Suggested review roles: Product owner; qualified regulatory reviewer. Lifecycle: Product/activity applicability. Assess each verification for this chapter’s actual scope and the role responsible for it. Record the applicable requirement/decision reference; any N/A needs a specific reason. These are CUP engineering prompts, not a complete normative inventory.

  1. Product functions identified

    Evidence to request: Product-scope record. Document only when: The reviewed product and relevant dependencies are explicit.

  2. Market activity examined

    Evidence to request: Market-placement assessment. Document only when: The activity and its connection to scope are reviewed.

  3. Exclusions justified

    Evidence to request: Applicability review. Document only when: Any asserted exclusion has a recorded qualified rationale.

Is this product and activity within the reviewed CRA scope?
02 · Economic-operator responsibilitiesManufacturer, importer, distributor or other relevant role, supply-chain relationships and accountable contacts.
Detailed verifications (3)

Suggested review roles: Relevant economic operator; supply-chain owner. Lifecycle: Role and responsibility allocation. Assess each verification for this chapter’s actual scope and the role responsible for it. Record the applicable requirement/decision reference; any N/A needs a specific reason. These are CUP engineering prompts, not a complete normative inventory.

  1. Role established

    Evidence to request: Economic-operator assessment. Document only when: The organisation’s role follows its actual activity.

  2. Supply-chain responsibilities assigned

    Evidence to request: Responsibility register. Document only when: Relevant handovers and escalation owners are explicit.

  3. Role-changing actions considered

    Evidence to request: Branding or modification review. Document only when: Potential changes of responsibility are assessed.

Which obligations belong to this organisation in this activity?
03 · Applicable provisions and timingCurrent legal text, transition analysis, product placement dates and reporting-readiness review.
Detailed verifications (3)

Suggested review roles: Regulatory reviewer; response owner. Lifecycle: Application dates and transition review. Assess each verification for this chapter’s actual scope and the role responsible for it. Record the applicable requirement/decision reference; any N/A needs a specific reason. These are CUP engineering prompts, not a complete normative inventory.

  1. Current text identified

    Evidence to request: Legal-basis register. Document only when: Binding text is distinguished from guidance or proposals.

  2. Application dates reviewed

    Evidence to request: Timing assessment. Document only when: Applicable provisions and transition treatment are separated.

  3. Reporting readiness reviewed separately

    Evidence to request: Article 14 readiness decision. Document only when: An older placement date is not used as the sole reason to dismiss reporting readiness.

Which obligations apply now and which preparation milestones remain?
04 · Product category and assessment routeIntended purpose, category analysis, applicable implementing measures and conformity-assessment rationale.
Detailed verifications (3)

Suggested review roles: Product regulatory owner; assessment lead. Lifecycle: Category and assessment-route selection. Assess each verification for this chapter’s actual scope and the role responsible for it. Record the applicable requirement/decision reference; any N/A needs a specific reason. These are CUP engineering prompts, not a complete normative inventory.

  1. Intended purpose reviewed

    Evidence to request: Category assessment. Document only when: Classification uses the actual product purpose.

  2. Current category rules checked

    Evidence to request: Implementing-measure register. Document only when: The reviewed basis is dated and traceable.

  3. Assessment route justified

    Evidence to request: Conformity route decision. Document only when: The route follows the applicable category analysis.

What supports the chosen product category and assessment route?
05 · Product cybersecurity risk assessmentIntended and foreseeable use, threat paths, dependencies and design-risk decisions.
Detailed verifications (3)

Suggested review roles: Product security architect; risk owner. Lifecycle: Product cybersecurity risk assessment. Assess each verification for this chapter’s actual scope and the role responsible for it. Record the applicable requirement/decision reference; any N/A needs a specific reason. These are CUP engineering prompts, not a complete normative inventory.

  1. Product use examined

    Evidence to request: Product risk assessment. Document only when: Intended and foreseeable use inform the reasoning.

  2. Dependency threats considered

    Evidence to request: Threat and dependency review. Document only when: Inherited weaknesses are included in the scope.

  3. Design decisions linked

    Evidence to request: Risk treatment trace. Document only when: Security choices have product-specific justification.

Does the assessment explain the product’s cybersecurity design choices?
06 · Security requirements and verificationApplicable essential requirements, implementation evidence, secure configuration and verification results.
Detailed verifications (3)

Suggested review roles: Requirement/verification owners; product security. Lifecycle: Design and released-build verification. Assess each verification for this chapter’s actual scope and the role responsible for it. Record the applicable requirement/decision reference; any N/A needs a specific reason. These are CUP engineering prompts, not a complete normative inventory.

  1. Applicable requirements identified

    Evidence to request: Requirements register. Document only when: Inclusions and exclusions have reasons.

  2. Released implementation examined

    Evidence to request: Build-specific verification. Document only when: Evidence covers the delivered baseline.

  3. Gaps treated explicitly

    Evidence to request: Requirement-gap review. Document only when: Unproven conditions have owners and next steps.

What demonstrates the relevant product security requirements on the released build?
07 · Components and dependency knowledgeComponent inventory, supplier inputs, inherited vulnerabilities and dependency-review records.
Detailed verifications (3)

Suggested review roles: Inventory owner; supplier manager. Lifecycle: Dependency review and vulnerability intake. Assess each verification for this chapter’s actual scope and the role responsible for it. Record the applicable requirement/decision reference; any N/A needs a specific reason. These are CUP engineering prompts, not a complete normative inventory.

  1. Inventory usable

    Evidence to request: Component inventory reference. Document only when: The team can identify security-relevant dependencies.

  2. Supplier evidence assessed

    Evidence to request: Supplier review record. Document only when: Upstream limitations are not hidden by an inventory entry.

  3. Findings routed to triage

    Evidence to request: Dependency finding sample. Document only when: A representative finding reaches an owned decision.

Can the team identify which supplied components affect product security?
08 · Vulnerability handling and disclosureIntake channel, validation, coordinated disclosure, remediation and supplier escalation procedures.
Detailed verifications (3)

Suggested review roles: Vulnerability-response lead; supplier contact. Lifecycle: Intake, remediation and disclosure. Assess each verification for this chapter’s actual scope and the role responsible for it. Record the applicable requirement/decision reference; any N/A needs a specific reason. These are CUP engineering prompts, not a complete normative inventory.

  1. Intake operational

    Evidence to request: Intake exercise reference. Document only when: A report reaches someone who can assess it.

  2. Remediation coordinated

    Evidence to request: Response workflow sample. Document only when: Validation and disclosure responsibilities are assigned.

  3. Supplier constraints escalated

    Evidence to request: Escalation record. Document only when: Missing support produces an owned response rather than a dead end.

Can a reported weakness reach an owned response decision?
09 · Reporting readinessReportability assessment process, current deadlines and channels, duty coverage and evidence-preservation plan.
Detailed verifications (4)

Suggested review roles: Reporting decision owner; duty response team. Lifecycle: Reportability assessment and reporting readiness. Assess each verification for this chapter’s actual scope and the role responsible for it. Record the applicable requirement/decision reference; any N/A needs a specific reason. These are CUP engineering prompts, not a complete normative inventory.

  1. Reportability assessed

    Evidence to request: Current reporting procedure. Document only when: The team can identify who assesses possible reportability.

  2. Deadlines and channels current

    Evidence to request: Authoritative reporting-basis record. Document only when: The relevant process uses a reviewed current basis.

  3. Duty coverage exercised

    Evidence to request: Timed tabletop record. Document only when: Out-of-hours and supplier delays are considered.

  4. Submission authority assigned

    Evidence to request: Reporting responsibility record. Document only when: An accountable role can act without treating this worksheet as a submitted report.

Can the team assess and escalate a potentially reportable event in time?
10 · Support period and security updatesSupport-period rationale, user information, update delivery and vulnerability-remediation resources.
Detailed verifications (3)

Suggested review roles: Product support owner; update engineering. Lifecycle: Support commitment and update operation. Assess each verification for this chapter’s actual scope and the role responsible for it. Record the applicable requirement/decision reference; any N/A needs a specific reason. These are CUP engineering prompts, not a complete normative inventory.

  1. Support rationale documented

    Evidence to request: Support-period assessment. Document only when: The declared period has a product-specific basis.

  2. Commitment communicated

    Evidence to request: Published support information. Document only when: User-facing information matches the reviewed commitment.

  3. Update capability sustained

    Evidence to request: Maintenance resource plan. Document only when: The organisation can support the promised security handling.

Can the promised support and update handling be sustained?
11 · Technical documentation and market informationTechnical file index, conformity route evidence, declaration and marking review where applicable, user information and records retention.
Detailed verifications (3)

Suggested review roles: Technical-file custodian; regulatory signatory. Lifecycle: Dossier and market-information review. Assess each verification for this chapter’s actual scope and the role responsible for it. Record the applicable requirement/decision reference; any N/A needs a specific reason. These are CUP engineering prompts, not a complete normative inventory.

  1. Evidence locatable

    Evidence to request: Technical-file index. Document only when: A reviewer can find the relevant supporting records.

  2. Formal steps reviewed

    Evidence to request: Conformity documentation review. Document only when: Required declaration or marking steps are distinguished from plans.

  3. User information checked

    Evidence to request: Product information review. Document only when: The supplied information matches the product and applicable basis.

Can a reviewer locate the evidence behind the market-facing claim?
12 · Release, monitoring and reassessmentOwned release decision, unresolved gaps, post-market monitoring and modification triggers.
Detailed verifications (3)

Suggested review roles: Release owner; post-market response lead. Lifecycle: Release, monitoring and modification review. Assess each verification for this chapter’s actual scope and the role responsible for it. Record the applicable requirement/decision reference; any N/A needs a specific reason. These are CUP engineering prompts, not a complete normative inventory.

  1. Release conditions owned

    Evidence to request: Release-readiness record. Document only when: Outstanding conditions have an authorised decision owner.

  2. Post-market findings acted on

    Evidence to request: Monitoring response record. Document only when: New evidence can trigger action.

  3. Material changes reassessed

    Evidence to request: Modification review trigger. Document only when: Scope, category and assessment implications can be revisited.

Who decides whether the product evidence needs to be reopened?
PRIMARY REFERENCES · REVIEWED 1 NOVEMBER 2026

Check the source and its applicability.

Public catalogue and guidance links support orientation. Licensed standards and legally authentic texts govern their respective requirements. This worksheet does not establish equivalence between standards and regulations.

CRA — Regulation (EU) 2024/2847

Use the official source to check the relevant scope, current text and applicable conditions.

Open official reference →

Commission — CRA summary and application dates

Use the official source to check the relevant scope, current text and applicable conditions.

Open official reference →

Commission — CRA implementation resources

Use the official source to check the relevant scope, current text and applicable conditions.

Open official reference →